New Sukosan Hotel and Campsite With 1000 Bed Capacity on Horizon

Lauren Simmonds

Updated on:

As Poslovni Dnevnik writes, in the area of ​​Tustica, just outside the settlement of Sveti Petar towards Sukosan, a brand new hotel and campsite with a capacity of 1000 beds will be built, along with various beach facilities, a promenade, one berth and mooring availability for 200 boats. The above was published on the official website of Sveti Filip i Jakov.

“The new urban development plan (UPU) of the catering/hospitality and tourist zone is extremely important for the residents of Sveti Petar, on which we’ve been working intensively for the past couple of years. After getting the green light from the Ministry of Physical Planning, Construction and State Property, UPU was unanimously accepted by the Council, which will significantly affect the better standard of local residents, especially when it comes to demographic renewal,” said Mayor Pelicaric in conversation with Slobodna Dalmacija.

Amendments to the UPU were made by the company Volat from Posedarje, and the brand new zone will include micro-destinations (Babac, Rastane Donje, Rastane Gornje, Sikovo, Sv. Filip i Jakov, Sveti Petar na Moru and Turanj) which will thus be able to develop in a far better way in terms of tourism. The building land includes the northeastern part of the catering/hospitality and touristic area near the Adriatic Highway and a recreation zone with a mooring and a beach in the southwestern part.

“The new Sukosan hotel and the campsite are being planned to be within the economic zone for catering/hospitality and tourist purposes, while in the recreation zone, a well-kept sea beach and mooring availabilities are being planned. The catering/hospitality and tourist zone also includes a unit for the construction of a new hotel with a minimum of four stars in the western part and a zone for the construction of a campsite in the eastern part, while the accommodation capacities of the catering/hospitality and tourist zone is 1000 beds in both hotel and camp facilities.

In the T1 hospitality and tourism zone, at least 70 percent of the accommodation units must be within the new hotel building, and a maximum of 30 percent in the annexes. Within the zone covered by the plan, it is mandatory that we build an intersection and two underpasses for the needs of public pedestrian access to the coastal part and the planned road access to the port,” he stressed.

In addition to all of the above, within the spatial unit T3, the construction of a new campsite is planned, and all of the necessary facilities for the complete provision of services in that spatial unit must be realised on the planned building plot.

For more, make sure to check out our business and travel sections.

 

Subscribe to our newsletter

the fields marked with * are required
Email: *
First name:
Last name:
Gender: Male Female
Country:
Birthday:
Please don't insert text in the box below!

Leave a Comment