August 28, 2019 – In cooperation with the Ministry of Regional Development and EU Funds and the Pag Tourist Board, and as part of the Island Development Program in 2019, the City of Pag will set out to arrange a pedestrian-cycling path “Embrace the Stone and the Wind” next month, reports HRTurizam.
The main objective of the project will be to invest in public tourism infrastructure and to enrich the tourist offer of sports and recreation, directly through the arrangement and rehabilitation of the hiking-cycling path, and indirectly by investing in the tourist offer of the city of Pag and promoting it as a cycling tourist destination.
Along the pedestrian-bicycle path, three locations will be arranged as resting places that are selected according to the criterion of dividing the trail into sections, i.e., according to the height of a particular section of the trail and the available views. Each rest area will be arranged in such a way that it will be equipped with urban equipment (benches, waste bins, bicycle stands and info panels with information about the town of Pag, sites seen from the trail, etc.).
Grad Pag
The highest point of the trail will be where the Adriatic winds – bura, jugo, tramontana, maestral, burin, levant – trigger wind turbine blades that will be encountered further along the course.
“The implementation of the project directly influences the increase of the tourist value of the City of Pag as a cultural, active, and environmentally conscious tourist city. Cycling in Pag has enormous potential given the unusual, untouched scenery full of contrasts, as it is well known that the main motive for guests visiting is the attractiveness of the landscape. The development of cycling tourism on the island is an excellent tool for the extension of the pre and post-season, and it is in accordance with the Strategy for the Development of Croatian Tourism, in which the main goal is to position Croatia as one of the leading Mediterranean cycling tourism destinations,” the city of Pag points out.
About 200 meters from the historic center of Pag, near the town cemetery, begin the ascent to the top of Kiršin (263 m.n.v.) which houses the HRT transmitter and then continues through the Ravna wind farm field. Due to the weather (rain, storm, salt), karst landscape and poor maintenance, it is in bad condition. The total length of the trail is 7.5 km. The path will be tidied up and marked, and one part repaired and filled in that is 2.5 km long.
Also, three rest areas with urban equipment and tables will be arranged, with benches, waste bins, and bicycle racks. Panel info and trail information boards will be installed, with indigenous plant labels, prehistoric hillforts, and other interesting and instructional information along the trail, as well as bike route signage.
The total value of the project is HRK 444,444.44, of which HRK 200,000.00 was provided by the Ministry of Regional Development and EU Funds and the rest (HRK 244,444.44) by the City of Pag. The works should be completed by the end of 2019.
To read more about travel in Croatia, follow TCN’s dedicated page.