“The reconstruction of the hospital block proves the government and ministry’s strategy to help in the recovery of health institutions’ capacity”, the minister said.
The block, which consists of two fully equipped operating rooms, was fully renovated with funds from the 2014-2020 Operational Programme Competitiveness and Cohesion and a Health Ministry budget reallocation of HRK 10.6 million.
“The reopening of the operating rooms and restoring the accommodation capacity of the Children’s Hospital is the first significant step in the recovery of the city’s medical capacity since the earthquake”, hospital director Goran Roić said.
Minister Beroš announced other similar projects in the Zagreb medical system.
As regards efforts to deal with the consequences of the 2020 earthquake, based on a public call by the Health Ministry for the allocation of grants, contracts have been signed so far with 60 institutions, established by the state or the City of Zagreb, worth HRK 2.3 billion.
Of that amount, HRK 850 million comes from the European Solidarity Fund and HRK 1.45 billion from other sources.
(€1 = HRK 7.5)
For more, check out our lifestyle section.